拜托帮翻译这句吧 真心翻译不出来了!Building re regulations commonly require that two main objectives be met: life safety of theoccupants and structural stability of the building. Two distinctly different design procedures areapplied in

来源:学生作业帮助网 编辑:作业帮 时间:2024/11/09 09:54:42

拜托帮翻译这句吧 真心翻译不出来了!Building re regulations commonly require that two main objectives be met: life safety of theoccupants and structural stability of the building. Two distinctly different design procedures areapplied in
拜托帮翻译这句吧 真心翻译不出来了!
Building re regulations commonly require that two main objectives be met: life safety of the
occupants and structural stability of the building. Two distinctly different design procedures are
applied in each case.
In the case of structural stability, the objective is to protect property and ensure that reghters
can gain entry to the building without the risk of a structural collapse. Here, the time frame is
relatively long (often 0.5 to 3 hours), the re is assumed to have caused ashover, and the design
re is usually given as a temperature–time curve. We shall not discuss this design case here.
However, Chapter 6 will address the issue of post-ashover temperatures in compartments.
In the case where the objective is to facilitate escape for the occupants, the time frame is usually
relatively short (most often less than 30 minutes) and the design re is specied as energy release
rate vs. time; this case is the focus of our book.
When an engineer is to design a beam, a design load must be chosen. The beam cannot be designed
for all possible load combinations that can occur during the building life span. Similarly, when
designing for re safety, the purpose of the design is not to simulate accurately all possible res that
could occur in the building. The engineer must rst decide upon how much material can be expected
to burn and how rapidly it will burn, and thus arrive at a design re. The purpose of the design work
is mainly to help the engineer form an opinion of the possible consequences and establish a basis for
appraising the risks due to a building re. The engineer can then compare the effectiveness of different
safety measures; for example, how smoke ventilation through the roof would compare with installing
early warning devices with regard to allowing means of escape to the occupants.
额 发错了 the starting time, denoted t0, depends both on the commodity in question and the manner in which it
is ignited and is generally taken to be the time from ignition until aming occurs, when signicant
energy starts to be released.

拜托帮翻译这句吧 真心翻译不出来了!Building re regulations commonly require that two main objectives be met: life safety of theoccupants and structural stability of the building. Two distinctly different design procedures areapplied in
这他么是一句吗?坑爹呢?