The building of the road has been __________ up by the heavy rain.broken drew hung held

来源:学生作业帮助网 编辑:作业帮 时间:2024/11/14 11:39:31

The building of the road has been __________ up by the heavy rain.broken drew hung held
The building of the road has been __________ up by the heavy rain.
broken
drew
hung
held

The building of the road has been __________ up by the heavy rain.broken drew hung held
The building of the road has been hung up by the heavy rain.
这条路的铺设工程因大雨被迫中断了.

broken 以后这种被毁坏的,基本都是broken

hung,道路修建工作因为大雨而被迫延期

broken up破碎的;裂缝性的

HUNG UP暂时停工 歇工