1.THIS DRAWING IS FOR PROPOSAL PURPOSES ONLY (NOT FOR CONSTRUCTION).2.ALL DRIVES TO BE FULLY GUARDED.3.PAINT COLOR:7-B GRAY STANDARD INDUSTRIAL ENAMEL,OR MATCHINGCUSTOMER SPECIFICATIONS AND COMPATIBLE WITH HENRY FILTERSPAINTING PROCESS.4.ELECTRICAL A
来源:学生作业帮助网 编辑:作业帮 时间:2024/11/15 08:31:02
1.THIS DRAWING IS FOR PROPOSAL PURPOSES ONLY (NOT FOR CONSTRUCTION).2.ALL DRIVES TO BE FULLY GUARDED.3.PAINT COLOR:7-B GRAY STANDARD INDUSTRIAL ENAMEL,OR MATCHINGCUSTOMER SPECIFICATIONS AND COMPATIBLE WITH HENRY FILTERSPAINTING PROCESS.4.ELECTRICAL A
1.THIS DRAWING IS FOR PROPOSAL PURPOSES ONLY (NOT FOR CONSTRUCTION).
2.ALL DRIVES TO BE FULLY GUARDED.
3.PAINT COLOR:7-B GRAY STANDARD INDUSTRIAL ENAMEL,OR MATCHING
CUSTOMER SPECIFICATIONS AND COMPATIBLE WITH HENRY FILTERS
PAINTING PROCESS.
4.ELECTRICAL AND/OR PNEUMATIC CONTROL PANEL(S) TO BE SHIPPED
LOOSE WITH FINAL CONNECTIONS TO COMPONENTS BY OWNER / CONTRACTOR.
5.DIRTY AND CLEANT TANK TO BE COVERED AS NOTED ON DRAWING.
6.RAMP TO BE COVERED AS NOTED ON DRAWING.
7.IF APPLICABLE,ANY PERIPHERAL EQUIPMENT LOCATIONS TO BE DETERMINED
BY OWNER / CONTRACTOR.
8.DRAIN PLUGS TO BE INSTALLED LIQUID TIGHT PRIOR TO TANK INSTALLATION.
9.RAMP TO BE REMOVED FOR SHIPPING PURPOSES AND RE-INSTALLED BY
OWNER / CONTRACTOR.THE BASE PLATE,SIDE PLATES,AND SHIPPED LOOSE
ITEMS TO BE WELDED LIQUID TIGHT AND GROUND SMOOTH.
这个问题请大家体现下实力!
1.THIS DRAWING IS FOR PROPOSAL PURPOSES ONLY (NOT FOR CONSTRUCTION).2.ALL DRIVES TO BE FULLY GUARDED.3.PAINT COLOR:7-B GRAY STANDARD INDUSTRIAL ENAMEL,OR MATCHINGCUSTOMER SPECIFICATIONS AND COMPATIBLE WITH HENRY FILTERSPAINTING PROCESS.4.ELECTRICAL A
1.THIS DRAWING IS FOR PROPOSAL PURPOSES ONLY (NOT FOR CONSTRUCTION).
1 本图纸仅用于投标(或建议书)(不是用于施工的)
2.ALL DRIVES TO BE FULLY GUARDED.
2 所有传动装置都受到完全的保护
3.PAINT COLOR:7-B GRAY STANDARD INDUSTRIAL ENAMEL,OR MATCHING
CUSTOMER SPECIFICATIONS AND COMPATIBLE WITH HENRY FILTERS
PAINTING PROCESS.
3 油漆颜色:7-B 灰色标准工业瓷漆,或者与客户的技术条件所匹配,并与亨利过滤器涂装工艺相兼容
4.ELECTRICAL AND/OR PNEUMATIC CONTROL PANEL(S) TO BE SHIPPED
LOOSE WITH FINAL CONNECTIONS TO COMPONENTS BY OWNER / CONTRACTOR.
4 电气的和/或气动的控制面板要由业主/承包商将与元器件的最后连接松开加以发货(装运)
5.DIRTY AND CLEANT TANK TO BE COVERED AS NOTED ON DRAWING.
5 脏的和干净的储罐(槽)按图纸的注解覆盖
6.RAMP TO BE COVERED AS NOTED ON DRAWING.
6 斜轨按图纸的注解覆盖.
7.IF APPLICABLE,ANY PERIPHERAL EQUIPMENT LOCATIONS TO BE DETERMINED BY OWNER / CONTRACTOR.
7 如果适用,任何外围设备的位置由业主/承包商决定
8.DRAIN PLUGS TO BE INSTALLED LIQUID TIGHT PRIOR TO TANK INSTALLATION.
在储罐(槽)安装前,要安装对液体密封的排水孔塞,
9.RAMP TO BE REMOVED FOR SHIPPING PURPOSES AND RE-INSTALLED BY
OWNER / CONTRACTOR.THE BASE PLATE,SIDE PLATES,AND SHIPPED LOOSE ITEMS TO BE WELDED LIQUID TIGHT AND GROUND SMOOTH.
9 为了发货(装运),斜轨要卸去,并由业主/承包商重新安装.基板、侧板和发货的松弛项目要对液体密封的焊接,并基础平滑.
1。本绘图只为提案目的(不包括项目建议书的目的)
2。所有驱动器得到充分保护。
3。漆色:7 - B的灰色标准工业搪瓷,或匹配
客户要求的规格与相容亨利滤波器
涂装工艺。
4。电和/或气动控制面板(s)到拟运
由所有者与Final连接的松散的组件/承包商。
5。 CLEANT脏水箱也包括在内论制图指出。
6。坡道也包...
全部展开
1。本绘图只为提案目的(不包括项目建议书的目的)
2。所有驱动器得到充分保护。
3。漆色:7 - B的灰色标准工业搪瓷,或匹配
客户要求的规格与相容亨利滤波器
涂装工艺。
4。电和/或气动控制面板(s)到拟运
由所有者与Final连接的松散的组件/承包商。
5。 CLEANT脏水箱也包括在内论制图指出。
6。坡道也包括在内论制图指出。
7。如果适用,任意外围设备的地点待定
由业主/承包商。
8。漏极插头安装液密之前的水箱。
9。坡道予以撤销航运业和再安装
车主/承包商。底板,侧板,运往松散
项目被焊接液体紧张,地面平坦。
收起