英语翻译A complete schematic of the experimental set up is shown in Fig 2.The experimental set up was installed at Alternate Hydro Energy Centre,Indian Institute of Technology,Roorkee.A Kirloskar (KC 100-65-315) pump of specific speed 18 (m,m3/s)

来源:学生作业帮助网 编辑:作业帮 时间:2024/11/18 01:23:21

英语翻译A complete schematic of the experimental set up is shown in Fig 2.The experimental set up was installed at Alternate Hydro Energy Centre,Indian Institute of Technology,Roorkee.A Kirloskar (KC 100-65-315) pump of specific speed 18 (m,m3/s)
英语翻译
A complete schematic of the experimental set up is shown in Fig 2.The experimental set up was installed at Alternate Hydro Energy Centre,Indian Institute of Technology,Roorkee.A Kirloskar (KC 100-65-315) pump of specific speed 18 (m,m3/s) was selected to operate in pump and turbine mode.The maximum head,flow and
input power for the pump are 32.8 m,0.0148 m3/s and 8.18 kW respectively.The discharge was measured using venturimeter.Apart from this manometer,pressure gauge,valves,tank and pipes are also installed in the experimentation set up.To measure the output power a synchronous generator of 12.5 kVA was coupled to the
PAT.The pump/turbine generator set is shown in Fig 3.The PAT was operated at the speed of 1500 rpm.An auxiliary pump is also used to supply the water at desired head and flow rate.This auxiliary pump supply water from the tank to the inlet of the pump testing in reverse mode.To regulate the excessive flow a by pass pipe was connected between the upper pipe and tank.The components of the experimental setup are listed in Tab.1.

英语翻译A complete schematic of the experimental set up is shown in Fig 2.The experimental set up was installed at Alternate Hydro Energy Centre,Indian Institute of Technology,Roorkee.A Kirloskar (KC 100-65-315) pump of specific speed 18 (m,m3/s)
一个完整的原理对实验的建立是图2中所示.实验装置安装在水电能源中心的交替,印度理工学院,鲁尔基.被选定一个印度企业基洛斯卡公司编码为(KC 100-65-315)的泵,泵的具体速度18(米,立方米/秒)被选中和涡轮泵运行模式.最大的头、流量和输入功率为泵是32.8米、0.0148立方米/秒,分别为8.18千瓦.使用文丘里测量计排放测量. 除了这个,压力表、压力仪表、阀门、坦克和管道安装在实验也是成立的.衡量一种同步发电机输出功率的12.5 KAV-是耦合到帕特.泵/轮机发电机组是如图3.帕特的速度每分钟1500转的.一种辅助泵水用来供给在理想的头和流量.这副泵供水入口从内胆泵的逆向模式测试.过大的流量调节是通过一个管道被连接在钻杆和水槽之间.实验装置的组成中列出标签.1.